Industry cost calculator

About

What does this cost to build? Every input after Material Efficiency and structure bonuses, plus an estimated job installation cost broken into its terms.

Blueprint

Mine it yourself inputs

Selected ores default to none. Choose named raw ores here, or explicitly choose Explore all eligible ores. Ore availability is never inferred from location.

Mining rate is optional. Without it, time and ISK per hour stay unknown. Extra build-route costs exclude shared mining, hauling, ship and blueprint costs.

Structure rigs and job taxes are owner-set and unreadable from ESI, so set them to match the structure you actually use. An NPC station has no rig slots and charges 0.25%.

Summary

Entosis Link II Blueprint

Runs: 1Material Efficiency: 0Produces: 1 Entosis Link IIFacility: NPC stationCost index: 0.1721 in Jita

No material rig · High security · facility tax 0.25% (NPC default) · prices from Jita IV - Moon 4 - Caldari Navy Assembly Plant, The Forge · snapshot dated 2026-09-12 09:50 UTC · cost index fetched 2026-09-12 09:40 UTC

Blueprint requirements

Base manufacturing time per run, before bonuses: 2h 36m.

Blueprint skill requirements
SkillLevel
Industry5
Electronic Engineering1
Graviton Physics1

Materials

Materials for 1 run at ME 0 · rounded once for the whole job
MaterialBase per runJob base (ME 0)RequiredSell price (ISK)Buy price (ISK)Line at sell (ISK)Line at buy (ISK)Adjusted pricePrice source
Entosis Link I111 *27,990,000.00 ISK25,000,000.00 ISK27,990,000.00 ISK25,000,000.00 ISK21561948.816334907snapshot
Antimatter Reactor Unit707070111,300.00 ISK111,100.00 ISK7,791,000.00 ISK7,777,000.00 ISK47272.98716376041snapshot
Electrolytic Capacitor Unit80808043,160.00 ISK38,330.00 ISK3,452,800.00 ISK3,066,400.00 ISK46877.930331319905snapshot
Fusion Reactor Unit707070104,800.00 ISK75,280.00 ISK7,336,000.00 ISK5,269,600.00 ISK26119.61861381515snapshot
Graviton Reactor Unit707070111,300.00 ISK80,030.00 ISK7,791,000.00 ISK5,602,100.00 ISK27434.89902084376snapshot
Nuclear Reactor Unit707070104,100.00 ISK101,500.00 ISK7,287,000.00 ISK7,105,000.00 ISK19981.441938492935snapshot
Oscillator Capacitor Unit16016016041,190.00 ISK29,360.00 ISK6,590,400.00 ISK4,697,600.00 ISK38530.29833981175snapshot
Scalar Capacitor Unit10010010044,880.00 ISK31,050.00 ISK4,488,000.00 ISK3,105,000.00 ISK43474.70217131097snapshot
Tesseract Capacitor Unit80808049,000.00 ISK48,230.00 ISK3,920,000.00 ISK3,858,400.00 ISK41460.28227099768snapshot
Morphite3,0003,0003,00017,200.00 ISK16,400.00 ISK51,600,000.00 ISK49,200,000.00 ISK18179.459224926253snapshot
Transcranial Microcontrollers20202082,470.00 ISK80,090.00 ISK1,649,400.00 ISK1,601,800.00 ISK45630.79870331649snapshot
Synthetic Synapses20202089,590.00 ISK83,910.00 ISK1,791,800.00 ISK1,678,200.00 ISK60553.947779780814snapshot
High-Tech Transmitters40404088,840.00 ISK82,070.00 ISK3,553,600.00 ISK3,282,800.00 ISK44933.05906679641snapshot
R.A.M.- Electronics111 *598.80 ISK495.30 ISK598.80 ISK495.30 ISK569.9949380989891snapshot

* Held at one unit per run: every run needs at least one of every listed material, however far Material Efficiency and rigs reduce it.

Installation cost

Estimated installation cost · EIV 106,057,915.01 ISK x 0.2146
TermRateCost (ISK)
System cost index 0.17210.172118,252,567.17 ISK
Facility tax 0.25%0.0025265,144.79 ISK
SCC surcharge 4%0.044,242,316.60 ISK
Installation cost0.214622,760,028.56 ISK

Cost and margin

Total cost against what the Entosis Link II sells for
ScenarioMaterials (ISK)Installation (ISK)Total cost (ISK)Cost per unit (ISK)Revenue (ISK)Profit (ISK)Margin
Buy the inputs from sell orders and sell the product to buy orders135,241,598.80 ISK22,760,028.56 ISK158,001,627.36 ISK158,001,627.36 ISK135,100,000.00 ISK-22,901,627.36 ISK-16.-95%
Buy the inputs with buy orders and list the product at the sell price121,244,395.30 ISK22,760,028.56 ISK144,004,423.86 ISK144,004,423.86 ISK143,000,000.00 ISK-1,004,423.86 ISK0.-7%

Material modifier

Material modifier 1 · multiply these to reproduce it
MultiplierValue
Material Efficiency 01
Material modifier1

Caveats

  • CCP has never published a job cost or Estimated Item Value formula. The installation cost below is an estimate built from the Viridian expansion notes and community reverse engineering, not an official figure.
  • ESI reports the system cost index rounded to four decimal places while the server uses full precision, so the installation cost is approximate by construction.
  • No ESI route exposes a player structure's fitted rigs or its industry tax rate, so the structure, rig and tax above are whatever you selected. This page does not know how any real structure is configured.
  • Single level only. A material that is itself manufacturable is priced at the market here, not built. Component build trees are not part of this page.
  • The Estimated Item Value uses ME-0 base quantities and CCP adjusted prices. It is deliberately not reduced by Material Efficiency, the structure role bonus or a rig.
  • Invention, reactions, copying and research are out of scope. Manufacturing time is the SDE base time per run, before skill or facility time bonuses.

Formats