{"id":72976,"name":"ATXVIII 1v1 Navy Cruisers Proving Filament","slug":"atxviii-1v1-navy-cruisers-proving-filament","facts":{"volume":0.1,"base_price":10000,"portion_size":1},"group":{"id":4050,"name":"Abyssal Proving Filaments"},"bonuses":{"misc":[],"role":[],"skills":[]},"category":{"id":17,"name":"Commodity"},"icon_url":"https://images.evetech.net/types/72976/icon?size=64","materials":[],"published":false,"sde_build":3503375,"attributes":[],"meta_group":null,"variations":[],"description":"This filament allows a fleet containing a single capsuleer flying a empire Navy Cruiser to enter an Abyssal Proving Ground for a fight to the death against one other capsuleer.\nThe ships allowed to enter this proving ground event are the Augoror Navy Issue, Omen Navy Issue, Osprey Navy Issue, Caracal Navy Issue, Exequror Navy Issue, Vexor Navy Issue, Scythe Fleet Issue, and Stabber Fleet Issue.\nAll ships within this proving ground will receive a bonus that increases turret and missile damage by 25%, increases afterburner and microwarpdrive speed boost by 25%, decreases afterburner and microwarpdrive capacitor consumption by 50%, adds +500 shield, armor, and hull hitpoints, and doubles the benefits gained from overheating the following module groups: Tackle Modules, Propulsion Modules, Repair Modules, Resistance Modules, Energy Warfare Modules, Turrets, and Launchers.\nA repeatable challenge during this event will provide Capsuleers 50m ISK for each match where they deal at least 5,000 damage to their opponent.\n\nPilots equipped with modules or implants with a meta level higher than 5 will not be able to enter this proving ground.\nSensor dampeners, weapon disruptors, shield boost amplifiers, shield rechargers, shield power relays, shield flux coils, and core defense field purgers are banned in this proving format.\nShips entering this proving ground may have a maximum of one local repair module fitted (shield or armor).\n\nThe proving ground event accessed through this filament will be accessible for 24 hours, from downtime on November 12th until downtime on November 13th, YC124.","market_path":[],"produced_by":[]}