Tools
Orders cover the selected hub region. Price history is regional, not station-specific.
Facts
| Fact | Value |
|---|---|
| Max production limit | 10 |
Manufacturing
Time: 1h 18m
| Type | Quantity |
|---|---|
| Morphite | 1 |
| Transmitter | 3 |
| Miniature Electronics | 5 |
| Nanoelectrical Microprocessor | 5 |
| R.A.M.- Electronics | 1 |
| Mining Survey Chipset I | 1 |
| Type | Quantity | Probability |
|---|---|---|
| Mining Survey Chipset II | 1 |
| Skill | Level |
|---|---|
| Industry | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Copying
Time: 1h 2m 24s
| Type | Quantity |
|---|---|
| Data Sheets | 5 |
| R.Db - Core Complexion | 1 |
| Skill | Level |
|---|---|
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Research material
Time: 27m 18s
| Type | Quantity |
|---|---|
| Consumer Electronics | 1 |
| R.Db - Core Complexion | 1 |
| Reports | 1 |
| Skill | Level |
|---|---|
| Metallurgy | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Research time
Time: 27m 18s
| Type | Quantity |
|---|---|
| Consumer Electronics | 1 |
| R.Db - Core Complexion | 1 |
| Reports | 2 |
| Skill | Level |
|---|---|
| Research | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Industry cost
Industry cost calculator · materials after Material Efficiency and an estimated job installation cost