Tools
Orders cover the selected hub region. Price history is regional, not station-specific.
Facts
| Fact | Value |
|---|---|
| Max production limit | 1 |
Manufacturing
Time: 16h 40m
| Type | Quantity |
|---|---|
| Artificial Neural Network | 120 |
| Logic Circuit | 150 |
| Miniature Electronics | 48 |
| R.A.M.- Electronics | 1 |
| Micro Circuit | 150 |
| Type | Quantity | Probability |
|---|---|---|
| Capital Targeting Systems Stabilizer II | 1 |
| Skill | Level |
|---|---|
| Industry | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
| Electronic Superiority Rigging | 4 |
Copying
Time: 13h 20m
| Type | Quantity |
|---|---|
| Data Sheets | 50 |
| Skill | Level |
|---|---|
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
| Electronic Superiority Rigging | 1 |
Research material
Time: 5h 50m
| Type | Quantity |
|---|---|
| R.Db - Viziam | 1 |
| Consumer Electronics | 8 |
| Reports | 16 |
| Skill | Level |
|---|---|
| Metallurgy | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
| Electronic Superiority Rigging | 4 |
Research time
Time: 5h 50m
| Type | Quantity |
|---|---|
| Consumer Electronics | 8 |
| Reports | 8 |
| Skill | Level |
|---|---|
| Research | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
| Electronic Superiority Rigging | 4 |
Industry cost
Industry cost calculator · materials after Material Efficiency and an estimated job installation cost