Industry cost calculator

About

What does this cost to build? Every input after Material Efficiency and structure bonuses, plus an estimated job installation cost broken into its terms.

Blueprint

Mine it yourself inputs

Selected ores default to none. Choose named raw ores here, or explicitly choose Explore all eligible ores. Ore availability is never inferred from location.

Mining rate is optional. Without it, time and ISK per hour stay unknown. Extra build-route costs exclude shared mining, hauling, ship and blueprint costs.

Structure rigs and job taxes are owner-set and unreadable from ESI, so set them to match the structure you actually use. An NPC station has no rig slots and charges 0.25%.

Summary

Fiend Blueprint

Runs: 1Material Efficiency: 0Produces: 1 FiendFacility: NPC stationCost index: 0.1695 in Jita

No material rig · High security · facility tax 0.25% (NPC default) · prices from Jita IV - Moon 4 - Caldari Navy Assembly Plant, The Forge · snapshot dated 2026-10-30 10:50 UTC · cost index fetched 2026-10-30 10:40 UTC

Blueprint requirements

Base manufacturing time per run, before bonuses: 66h 40m. The SDE lists no required skills.

Materials

Materials for 1 run at ME 0 · rounded once for the whole job
MaterialBase per runJob base (ME 0)RequiredSell price (ISK)Buy price (ISK)Line at sell (ISK)Line at buy (ISK)Adjusted pricePrice source
Antimatter Reactor Unit303030104,000.00 ISK94,460.00 ISK3,120,000.00 ISK2,833,800.00 ISK46428.74068189365snapshot
Graviton Reactor Unit30303099,430.00 ISK93,550.00 ISK2,982,900.00 ISK2,806,500.00 ISK22772.462438961167snapshot
Fusion Thruster60606036,620.00 ISK32,000.00 ISK2,197,200.00 ISK1,920,000.00 ISK10053.556790371631snapshot
Magpulse Thruster60606036,150.00 ISK30,610.00 ISK2,169,000.00 ISK1,836,600.00 ISK13498.243603877936snapshot
Morphite15015015017,840.00 ISK17,500.00 ISK2,676,000.00 ISK2,625,000.00 ISK17515.996170013972snapshot
Radar Sensor Cluster18018018020,740.00 ISK15,040.00 ISK3,733,200.00 ISK2,707,200.00 ISK13043.735448369915snapshot
Construction Blocks19019019010,400.00 ISK9,811.00 ISK1,976,000.00 ISK1,864,090.00 ISK5271.385688102364snapshot
Scalar Capacitor Unit30030030043,150.00 ISK38,690.00 ISK12,945,000.00 ISK11,607,000.00 ISK38448.332687981005snapshot
Tesseract Capacitor Unit30030030058,790.00 ISK45,310.00 ISK17,637,000.00 ISK13,593,000.00 ISK38689.532688470186snapshot
Megacyte3603603601,894.00 ISK1,887.00 ISK681,840.00 ISK679,320.00 ISK1335.8881866557285snapshot
Sustained Shield Emitter75075075035,880.00 ISK30,510.00 ISK26,910,000.00 ISK22,882,500.00 ISK18367.353143637592snapshot
Zydrine1,2001,2001,2001,067.00 ISK1,003.00 ISK1,280,400.00 ISK1,203,600.00 ISK1105.9093483866634snapshot
Nanoelectrical Microprocessor1,5001,5001,50042,870.00 ISK38,250.00 ISK64,305,000.00 ISK57,375,000.00 ISK31556.293739236615snapshot
Quantum Microprocessor1,5001,5001,50038,280.00 ISK37,000.00 ISK57,420,000.00 ISK55,500,000.00 ISK31609.120548936422snapshot
Nocxium2,4002,4002,400690.60 ISK681.20 ISK1,657,440.00 ISK1,634,880.00 ISK602.1278794600569snapshot
Tungsten Carbide Armor Plate4,0004,0004,0006,948.00 ISK6,195.00 ISK27,792,000.00 ISK24,780,000.00 ISK6508.621739724096snapshot
Isogen9,6879,6879,687187.70 ISK178.40 ISK1,818,249.90 ISK1,728,160.80 ISK162.85187839395866snapshot
Pyerite15,40015,40015,40016.19 ISK16.04 ISK249,326.00 ISK247,016.00 ISK12.052381843676601snapshot
Mexallon40,00040,00040,00051.63 ISK49.06 ISK2,065,200.00 ISK1,962,400.00 ISK39.854903874708285snapshot
Tritanium614,300614,300614,3003.74 ISK3.73 ISK2,297,482.00 ISK2,291,339.00 ISK3.0714417128646985snapshot

Installation cost

Estimated installation cost · EIV 175,662,715.57 ISK x 0.212
TermRateCost (ISK)
System cost index 0.16950.169529,774,830.29 ISK
Facility tax 0.25%0.0025439,156.79 ISK
SCC surcharge 4%0.047,026,508.62 ISK
Installation cost0.21237,240,495.70 ISK

Cost and margin

Total cost against what the Fiend sells for
ScenarioMaterials (ISK)Installation (ISK)Total cost (ISK)Cost per unit (ISK)Revenue (ISK)Profit (ISK)Margin
Buy the inputs from sell orders and sell the product to buy orders235,913,237.90 ISK37,240,495.70 ISK273,153,733.60 ISK273,153,733.60 ISK252,500,000.00 ISK-20,653,733.60 ISK-8.-17%
Buy the inputs with buy orders and list the product at the sell price212,077,405.80 ISK37,240,495.70 ISK249,317,901.50 ISK249,317,901.50 ISKUnknownUnknownUnknown

Material modifier

Material modifier 1 · multiply these to reproduce it
MultiplierValue
Material Efficiency 01
Material modifier1

Caveats

  • CCP has never published a job cost or Estimated Item Value formula. The installation cost below is an estimate built from the Viridian expansion notes and community reverse engineering, not an official figure.
  • ESI reports the system cost index rounded to four decimal places while the server uses full precision, so the installation cost is approximate by construction.
  • No ESI route exposes a player structure's fitted rigs or its industry tax rate, so the structure, rig and tax above are whatever you selected. This page does not know how any real structure is configured.
  • Single level only. A material that is itself manufacturable is priced at the market here, not built. Component build trees are not part of this page.
  • The Estimated Item Value uses ME-0 base quantities and CCP adjusted prices. It is deliberately not reduced by Material Efficiency, the structure role bonus or a rig.
  • Invention, reactions, copying and research are out of scope. Manufacturing time is the SDE base time per run, before skill or facility time bonuses.

Formats