Industry cost calculator

About

What does this cost to build? Every input after Material Efficiency and structure bonuses, plus an estimated job installation cost broken into its terms.

Blueprint

Mine it yourself inputs

Selected ores default to none. Choose named raw ores here, or explicitly choose Explore all eligible ores. Ore availability is never inferred from location.

Mining rate is optional. Without it, time and ISK per hour stay unknown. Extra build-route costs exclude shared mining, hauling, ship and blueprint costs.

Structure rigs and job taxes are owner-set and unreadable from ESI, so set them to match the structure you actually use. An NPC station has no rig slots and charges 0.25%.

Summary

Dagon Blueprint

Runs: 1Material Efficiency: 0Produces: 1 DagonFacility: NPC stationCost index: 0.1675 in Jita

No material rig · High security · facility tax 0.25% (NPC default) · prices from Jita IV - Moon 4 - Caldari Navy Assembly Plant, The Forge · snapshot dated 2026-10-28 08:50 UTC · cost index fetched 2026-10-28 08:40 UTC

Blueprint requirements

Base manufacturing time per run, before bonuses: 666h 40m.

Blueprint skill requirements
SkillLevel
Capital Ship Construction3

Materials

Materials for 1 run at ME 0 · rounded once for the whole job
MaterialBase per runJob base (ME 0)RequiredSell price (ISK)Buy price (ISK)Line at sell (ISK)Line at buy (ISK)Adjusted pricePrice source
Capital Propulsion Engine88812,340,000.00 ISK10,980,000.00 ISK98,720,000.00 ISK87,840,000.00 ISK12459920.957085636snapshot
Capital Sensor Cluster10101012,490,000.00 ISK10,240,000.00 ISK124,900,000.00 ISK102,400,000.00 ISK12631567.541965492snapshot
Capital Armor Plates30303016,080,000.00 ISK12,850,000.00 ISK482,400,000.00 ISK385,500,000.00 ISK8196980.660701212snapshot
Capital Capacitor Battery20202010,490,000.00 ISK9,101,000.00 ISK209,800,000.00 ISK182,020,000.00 ISK8914913.057658914snapshot
Capital Power Generator21212114,500,000.00 ISK12,210,000.00 ISK304,500,000.00 ISK256,410,000.00 ISK16957049.730964534snapshot
Capital Shield Emitter10101012,320,000.00 ISK10,800,000.00 ISK123,200,000.00 ISK108,000,000.00 ISK8593031.16813524snapshot
Capital Jump Drive10101016,070,000.00 ISK14,510,000.00 ISK160,700,000.00 ISK145,100,000.00 ISK12727203.39370244snapshot
Capital Drone Bay6667,892,000.00 ISK6,960,000.00 ISK47,352,000.00 ISK41,760,000.00 ISK8922817.587511014snapshot
Capital Computer System10101011,790,000.00 ISK6,604,000.00 ISK117,900,000.00 ISK66,040,000.00 ISK8219142.689147687snapshot
Capital Construction Parts1616168,115,000.00 ISK7,232,000.00 ISK129,840,000.00 ISK115,712,000.00 ISK9195333.352025703snapshot
Capital Siege Array30303014,870,000.00 ISK11,050,000.00 ISK446,100,000.00 ISK331,500,000.00 ISK9271518.649988642snapshot
Capital Ship Maintenance Bay19191914,790,000.00 ISK4,811,000.00 ISK281,010,000.00 ISK91,409,000.00 ISK16098247.276653156snapshot
Capital Corporate Hangar Bay10101012,920,000.00 ISK11,610,000.00 ISK129,200,000.00 ISK116,100,000.00 ISK12210267.637407174snapshot
U-C Trigger Neurolink Conduit16161617,090,000.00 ISK15,100,000.00 ISK273,440,000.00 ISK241,600,000.00 ISK370115.4384225884snapshot
G-O Trigger Neurolink Conduit16161614,150,000.00 ISK11,690,000.00 ISK226,400,000.00 ISK187,040,000.00 ISK469620.6001294926snapshot
Radar-FTL Interlink Communicator55597,820,000.00 ISK90,250,000.00 ISK489,100,000.00 ISK451,250,000.00 ISK7885425.917427554snapshot
Ladar-FTL Interlink Communicator555107,900,000.00 ISK97,630,000.00 ISK539,500,000.00 ISK488,150,000.00 ISK11930657.511148978snapshot
Auto-Integrity Preservation Seal40040040048,000.00 ISK44,980.00 ISK19,200,000.00 ISK17,992,000.00 ISK8855.082261125037snapshot
Life Support Backup Unit20020020087,360.00 ISK84,710.00 ISK17,472,000.00 ISK16,942,000.00 ISK9862.723599958288snapshot
Capital Core Temperature Regulator111 *276,000,000.00 ISK197,200,000.00 ISK276,000,000.00 ISK197,200,000.00 ISK216064879.33956912snapshot
Neurolink Protection Cell111 *709,200,000.00 ISK685,000,000.00 ISK709,200,000.00 ISK685,000,000.00 ISK635801934.2202027snapshot

* Held at one unit per run: every run needs at least one of every listed material, however far Material Efficiency and rigs reduce it.

Installation cost

Estimated installation cost · EIV 3,178,369,299.14 ISK x 0.21
TermRateCost (ISK)
System cost index 0.16750.1675532,376,857.61 ISK
Facility tax 0.25%0.00257,945,923.25 ISK
SCC surcharge 4%0.04127,134,771.97 ISK
Installation cost0.21667,457,552.82 ISK

Cost and margin

Total cost against what the Dagon sells for
ScenarioMaterials (ISK)Installation (ISK)Total cost (ISK)Cost per unit (ISK)Revenue (ISK)Profit (ISK)Margin
Buy the inputs from sell orders and sell the product to buy orders5,205,934,000.00 ISK667,457,552.82 ISK5,873,391,552.82 ISK5,873,391,552.82 ISK56,590,000.00 ISK-5,816,801,552.82 ISK-10278.-85%
Buy the inputs with buy orders and list the product at the sell price4,314,965,000.00 ISK667,457,552.82 ISK4,982,422,552.82 ISK4,982,422,552.82 ISKUnknownUnknownUnknown

Material modifier

Material modifier 1 · multiply these to reproduce it
MultiplierValue
Material Efficiency 01
Material modifier1

Caveats

  • CCP has never published a job cost or Estimated Item Value formula. The installation cost below is an estimate built from the Viridian expansion notes and community reverse engineering, not an official figure.
  • ESI reports the system cost index rounded to four decimal places while the server uses full precision, so the installation cost is approximate by construction.
  • No ESI route exposes a player structure's fitted rigs or its industry tax rate, so the structure, rig and tax above are whatever you selected. This page does not know how any real structure is configured.
  • Single level only. A material that is itself manufacturable is priced at the market here, not built. Component build trees are not part of this page.
  • The Estimated Item Value uses ME-0 base quantities and CCP adjusted prices. It is deliberately not reduced by Material Efficiency, the structure role bonus or a rig.
  • Invention, reactions, copying and research are out of scope. Manufacturing time is the SDE base time per run, before skill or facility time bonuses.

Formats