Tools
ReprocessBuild with Standup M-Set ME Research Cost Optimization II BlueprintBlueprint requirements: Standup M-Set ME Research Cost Optimization II Blueprint
Orders cover the selected hub region. Price history is regional, not station-specific.
Overview
Structure Engineering Rig M - ME Research Cost Optimization · Structure Module · Structure Tech II
Facts
| Fact | Value |
|---|---|
| Mass | 200 kg |
| Volume | 10 m³ |
| Radius | 100 m |
| Portion size | 1 |
| Published | Yes |
Prices
| Market | Value |
|---|---|
| Jita 4-4 sell minimum | 1,297,000,000.00 ISK |
| Jita 4-4 buy maximum | 715,000,000.00 ISK |
| The Forge sell minimum | 1,297,000,000.00 ISK |
| The Forge buy maximum | 715,000,000.00 ISK |
| Sell volume | 2 |
| Buy volume | 3 |
| Snapshot loaded | 2026-09-13T17:21:58.326Z |
| HTTP last modified | 2026-09-13T16:50:16.000Z |
| Source | snapshot |
Other
| Attribute | Value |
|---|---|
| Max Modules Of This Group Allowed | 1 |
Fitting
| Attribute | Value |
|---|---|
| Can only be fitted to | 1657 groupID |
| Can be fitted to | 1404 groupID |
| Can be fitted to | 1406 groupID |
| Calibration cost | 150 |
Structure
| Attribute | Value |
|---|---|
| Structure Hitpoints | 40 HP |
Miscellaneous
| Attribute | Value |
|---|---|
| Rig Size | 2 1=small 2=medium 3=l |
| Tech Level | 2 Level |
Required Skills
| Attribute | Value |
|---|---|
| Primary Skill required | 26252 typeID |
Bonuses
| Attribute | Value |
|---|---|
| Cost Reduction Bonus | -12 % |
| Material Reduction Bonus | 0 % |
| Time Reduction Bonus | 0 % |
| High Security Bonus Multiplier | 1 x |
| Low Security Bonus Multiplier | 1.9 x |
| Nullsec and Wormhole Bonus Multiplier | 2.1 x |
Materials
| Type | Quantity |
|---|---|
| Telemetry Processor | 700 |
| Current Pump | 700 |
| Trigger Unit | 700 |
| Drone Transceiver | 700 |
| Artificial Neural Network | 700 |
| Micro Circuit | 700 |
| Logic Circuit | 16 |
| Interface Circuit | 16 |
| Impetus Console | 1,300 |
| Capacitor Console | 16 |
Reprocessing calculator · yield, tax, and whether selling it intact pays more
Industry
| Blueprint | Activity | Quantity |
|---|---|---|
| Standup M-Set ME Research Cost Optimization II Blueprint | manufacturing | 1 |
Variations
- Standup M-Set ME Research Cost Optimization I (Structure Tech I)